Project Description

Start Year 2015
Location Tunisia
Industry Energy
Technology SIEMENS SPPA-T3000
Services Pending point clearance, Post-Commissioning support

Start Year: 2015

Location: Tunisia

Industry: Energy

Technology: SIEMENS SPPA-T3000

Services: Pending point clearance, Post-Commissioning support

Engineering/Support services (end-commissioning pending point clearance), third parties communications completion and commissioning) specific for the 400 MW (1+1 Single Shaft CC; GT AE94.3A x 298 MW – ST MT15 x 145 MW) gas powered combined cycle thermoelectric power plant control system using SIEMENS SPPA T3000, S7-400 and ET200M technology. Assistance for post-commissioning, maintenance, inspection and support activities.

  • A factory with many pipes and buildings on it
  • A large industrial plant with pipes and a red and white tower.
  • A large industrial area with many buildings and equipment.
  • A building with a red and white tower in the background.
  • A bunch of wires are connected to the back of a rack.
  • A group of computer servers in a room.
  • A computer screen with various electrical and mechanical controls.